Written by Brent Humphreys   
Sunday, 26 July 2009 18:20

Bill Ghan provides us with another Pietenpol update

Today two sides of the fuselage were covered.  Also, all of the fuselage control surfaces are covered and taped.  Varnishing has started on the left wing and aileron, two coats done.

 

Jerry Varnishes the Left Aileron

 

Jerry and Rory varnish the left wing

The fabrick layout and cutting table.