|
Written by Brent Humphreys
|
|
Sunday, 26 July 2009 18:20 |
|
Bill Ghan provides us with another Pietenpol update Today two sides of the fuselage were covered. Also, all of the fuselage control surfaces are covered and taped. Varnishing has started on the left wing and aileron, two coats done.  Jerry Varnishes the Left Aileron  Jerry and Rory varnish the left wing
The fabrick layout and cutting table.
|