Home Chapter Projects Pietenpol Pietenpol update
Pietenpol update PDF Print E-mail
User Rating: / 0
PoorBest 
Written by Brent Humphreys   
Tuesday, 30 June 2009 05:38

Jerry Pfister wrote in last evening with a Pietenpol project Update:

Last work day on the Peitenpol Berlin Batesel (Hokie) did some Tig welding on the aluminum fuel tank that he had fabricated the previous day. Bill Gann got all the proper bends in the aileron hinges along with welding all the brackets for the belly stringer and making all the tabs required to attach the brace wires  in the wings. Rory and I worked on all the de-burring, draw filing and applying zinc chromate to them.